A&R Boilers — Internal Technical Reference Library
.
Need help with your boiler?
Our friendly team is on hand for repairs, servicing, replacements, and landlord safety checks across Altrincham.
IGEM/UP/1B Edition 4 — Tightness Testing and Direct Purging
Technical Briefing
Prepared 31 August 2026
Full briefing covering what the standard covers, the transition timeline to 1 October 2026, what’s
changing under Edition 4, and the practical implications for engineers on site.
A&R Boilers — Technical Briefing
IGEM/UP/1B Edition 4: Tightness Testing and Direct Purging Update
Prepared for: A&R Team Connect (Engineer Knowledge Hub) and A&R GPT
Date: 31 August 2026
1. WHAT THIS STANDARD COVERS
IGEM/UP/1B is the Institution of Gas Engineers and Managers standard covering tightness
testing and direct purging of small installations carrying natural gas, LPG, or LPG/Air.
It applies to installation pipework, including meters, up to a maximum installation volume
of 0.035 cubic metres — which covers the vast majority of domestic gas installations that
A&R engineers work on day to day (gas safety checks, boiler servicing, boiler repairs and
replacements).
Edition 4 supersedes Edition 3 and introduces a fundamentally different way of calculating
permissible pressure drops and purge volumes.
2. KEY DATES — THE TRANSITION TIMELINE
Published: March 2026
Now to 30 September 2026: Both Edition 3 and Edition 4 are technically acceptable. This is
a dual-running transition period. Gas Safe Register has confirmed it will not defect
businesses that are not yet fully conversant with Edition 4 during this window, and will
offer guidance where needed.
30 September 2026: Edition 3 is formally withdrawn.
1 October 2026: Edition 4 becomes mandatory. All tightness testing and purging from this
date must follow the new procedure.
Practical implication for A&R: every engineer needs to be working to Edition 4 procedures
before 1 October 2026. There is just over a month left in the transition window from
today’s date.
3. WHAT’S ACTUALLY CHANGING
A) Pressure drop limits are now based on Installation Volume, not meter size
Under Edition 3, the permissible pressure drop during a tightness test was determined
largely by the meter size and pipework diameter — engineers could look this up from a
straightforward table.
Under Edition 4, the permissible pressure drop is determined by calculating the actual
Installation Volume (IV) of the system in cubic metres. The bigger the installation, the
more allowance there is for natural, harmless pressure movement during a test. This is a
more accurate, volume-based approach rather than a broad-brush, meter-based one.
For pipework-only systems, or where only brand-new appliances are being connected, nothing
changes here — the standard remains “no perceptible movement” allowed.
B) How Installation Volume is calculated
IV is made up of three components:
– the volume of the pipework itself (based on pipe diameter and length, by section)
– the volume of fittings
– the volume of the meter
These are added together to get a total IV figure. This is the same figure used both to
determine the permissible pressure drop on the tightness test, and to calculate the purge
volume afterwards.
C) Purge volume — one formula for everything
This is the simplest part of the change, and good news operationally. Under Edition 3,
purge volume depended on meter size and pipework diameter, with different rules for
different setups. Under Edition 4, there is one single formula for every installation:
Purge Volume (PV) = 1.5 multiplied by Installation Volume (IV)
If an engineer has already worked out the IV for the tightness test, the purge volume
calculation is very quick — just multiply that figure by one and a half.
D) New requirement: isolating appliances when a drop is detected
Previously, if a pressure drop was detected on an installation with appliances already
connected, there was no explicit requirement to confirm whether the drop was coming from
the pipework itself or from an appliance. Edition 4 changes this: if a drop is detected,
engineers must now isolate appliances to confirm the drop is not attributable to the
pipework before concluding it’s appliance-related and acceptable.
Small amounts of gas escaping through an appliance within permissible limits is still
acceptable, provided there’s no smell of gas and a suitable site-specific risk assessment
supports leaving it connected. But the pipework itself must be proven sound independently
first.
4. WHY THIS MATTERS FOR A&R ENGINEERS ON SITE
This is a shift from a quick table look-up to an actual on-site calculation. Engineers will
need to:
– measure and record pipe lengths and diameters by section for every job
– calculate Installation Volume before determining whether a tightness test result is a
pass or fail
– apply the new isolation step whenever a pressure drop is detected on an installation
with connected appliances
– use the new PV = 1.5 x IV formula for all purging
This is more methodical than the old process and will take a bit of getting used to.
Several training providers are already running short update courses, and there are free
online calculators (for example from Gas Engineer Software and TomKat Gas Training) that
do the IV and PV maths automatically from pipe size and length inputs — useful as
interim tools while the team builds confidence with manual calculation.
Worth noting: real-world jobs that were previously routine and quick may now take slightly
longer where a calculation and isolation step is required, particularly on larger domestic
installations or where existing appliances are involved. Worth factoring into scheduling
expectations from October onwards.
5. SOURCES AND FURTHER READING
– IGEM official standard and FAQ page: igem.org.uk (technical standards, Utilisation UP
Series section)
– Gas Safe Register, Industry Standard Update 133 (Edition 2) — free plain-English summary
of the changes, available via gassaferegister.co.uk
– Free Installation Volume / Purge Volume calculators are available from several UK gas
training and software providers, useful for early practice and cross-checking manual
calculations.
6. SUGGESTED NEXT STEPS FOR A&R
– Confirm which A&R engineers still need Edition 4 update training before 1 October 2026.
– Decide whether A&R will build its own simple IV/PV calculator tool for the engineer hub,
or link out to an existing free one initially.
– Add this briefing, plus a plain worked example calculation, to the A&R Team Connect
knowledge hub.
– Feed the same content into A&R GPT so engineers and office staff can ask natural-language
questions about the new procedure.
– Consider a short internal toolbox talk or briefing session with the team well ahead of
the deadline, rather than leaving it to late September.
Worked Example: Installation Volume & Purge Volume Calculation
Prepared 31 August 2026
A step-by-step worked calculation showing how to work out Installation Volume and Purge Volume on a
typical domestic job under Edition 4.
A&R Boilers — Worked Example
IGEM/UP/1B Edition 4: Installation Volume and Purge Volume Calculation
This is a simple, illustrative example to accompany the main briefing document, showing
how an engineer would work through an Installation Volume (IV) and Purge Volume (PV)
calculation on a typical domestic job under Edition 4.
Note: the figures used for pipe and meter volumes below are approximate and for
illustration only. Always use the exact reference tables and figures in the published
IGEM/UP/1B Edition 4 standard, or a validated calculator, when carrying out a real
tightness test or purge on site.
SCENARIO
A domestic installation with:
– 8 metres of 22mm copper pipework running from the meter to the boiler
– a U6 gas meter fitted
– two elbow fittings and one tee fitting along the run
STEP 1 — Calculate the pipework volume
Multiply the approximate internal volume per metre for the pipe size by the total length.
22mm copper pipe: approximately 0.324 litres per metre
Length: 8 metres
Pipework volume = 0.324 x 8 = 2.592 litres
STEP 2 — Add the meter volume
Look up the internal volume for the meter type fitted.
U6 meter: approximately 1.2 litres
STEP 3 — Add an allowance for fittings
A small additional allowance is included for elbows, tees and similar fittings along the
run. In this example we’ve used an illustrative allowance of 0.3 litres.
STEP 4 — Add it all together to get Installation Volume (IV)
Pipework volume: 2.592 litres
Meter volume: 1.200 litres
Fittings allowance: 0.300 litres
———————————–
Total Installation Volume (IV) = 4.092 litres, which is 0.004092 cubic metres
This IV figure is what’s used to determine the permissible pressure drop for the
tightness test, taken from the tables in the standard.
STEP 5 — Calculate Purge Volume (PV)
Apply the Edition 4 formula, which is the same for every installation:
Purge Volume (PV) = 1.5 x Installation Volume (IV)
PV = 1.5 x 0.004092 m3 = 0.006138 cubic metres, which is 6.138 litres
So on this job, once the IV of 4.092 litres has been calculated for the tightness test,
the purge volume is simply 1.5 times that figure, giving 6.138 litres to be purged
through the installation.
KEY TAKEAWAY FOR ENGINEERS
Once you’ve worked out IV for the tightness test, you already have everything you need
for the purge volume too. It’s one calculation feeding two outcomes, rather than two
separate look-ups as under Edition 3. Getting comfortable measuring pipe runs accurately
on site and knowing the volume figures for common pipe sizes and meter types is the main
new skill required.
What our customers say
Real reviews from real customers across Greater Manchester.
